What a Septic Inspection Covers
The board's rules set a minimum, and an inspection meets it piece by piece.
The parts. Under Rule .1005, the inspector inspects and describes the septic tank, pump tanks, distribution devices, dispersal field, treatment units, control panels and other components the permit requires, including drainage, plus vegetation and grading as they affect the system. Lids and distribution devices are uncovered unless blocked, components are probed where deterioration is suspected, and signs of abnormal water entry are reported.
The tank. Rule .1006 lists its distance from the house and any well, the depth to the top of the tank or riser, any risers, the condition of the lids, baffle wall and outlet tee, the water level relative to the outlet, the outlet filter, roots, leakage, non-permitted inflow such as downspouts or sump pumps, the last pumping date if known, and the percentage of solids.
The field. The same rule covers the type of field, the number and length of lines, evidence of past or current surfacing, traffic over the field, and confirmation that effluent is reaching it.
The report. Rule .1002 requires a written contract and the owner's written permission before the visit, and a written report within 10 business days that says what was inspected, what was not and why, and gives the inspector's name, license number and signature. If a component cannot be found, the report must say "could not locate."