What a Septic Inspection Covers
Start at the paperwork, because the rules do. Before any digging, Rule .1002 requires a written contract signed by the client and the inspector, and written permission from the owner.
Then the system itself. Rule .1005 lists septic tanks, pump tanks, distribution devices, dispersal fields, treatment units, control panels and any other permitted component, including drainage, along with vegetation and grading as they affect the system. The inspector uncovers tank lids and distribution devices unless something blocks them, and probes parts where deterioration is suspected.
Rule .1006 sets the details. The tank record includes distances from the house and any well, how deep the top of the tank or riser sits, the lids, the baffle wall, the outlet tee, the water level against the outlet, the outlet filter, roots, leakage, connections from downspouts or sump pumps that are not permitted, the last pumping date and the percentage of solids. The field record includes the number and length of lines, any surfacing, evidence of traffic, and confirmation that effluent is reaching the field. Abnormal or harmful water getting into or out of the system is reported too, along with anything that prevented or hindered the inspection.
Last comes the report, within 10 business days. It must list any component not inspected and the reason, and a part the inspector could not find is reported as "could not locate."