What a Septic Inspection Covers
North Carolina sets the minimum. Under 21 NCAC 39 .1005, a point-of-sale inspector inspects and describes the septic tank, any pump tank, the distribution devices, the dispersal field, treatment units, control panels and any other permitted component, including drainage. The inspector uncovers tank lids and distribution devices unless access is blocked, probes parts where deterioration is suspected, and reports signs of abnormal or harmful water getting into or out of the system.
Rule .1006 fills in the details. At the septic tank, the list includes the condition of the lids, the baffle wall and the outlet tee, the water level compared with the outlet, any outlet filter, roots in the tank, signs of leakage, connections from downspouts or sump pumps that are not permitted, the date of the last pumping if known, and the share of solids in the tank. At the field, it covers the type of field, the number and length of lines, any surfacing, traffic over the field, and confirmation that effluent is reaching it.
Paperwork brackets the visit. The rules require a written contract signed before the inspection, written permission from the owner, and a written report within 10 business days. That report names what was inspected, what was not and why, and carries the inspector's name, license number and signature.